Skip to content
Peak Engine

FREE CALCULATOR · ESTIMATE ONLY

Concrete calculator.

Slabs, footings and round columns. Get cubic yards to order, or how many bags to buy.

TL;DR

Enter the size of your slab, footing or column and a waste allowance. The calculator gives cubic feet, cubic yards, cubic yards to order with waste, and how many 40, 60 or 80 lb bags you'd need at typical yields.

ft
ft
in
%

5–10% is a common allowance.

Your numbers

Volume133.33 cu ft
Volume4.94 cu yd
With waste, to order5.43 cu yd
Or 80 lb bags245
Or 60 lb bags326
Or 40 lb bags489

Estimate only. Bag counts use typical yields (80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45, 40 lb ≈ 0.30). Check the bag and your supplier, and round up to their order size. Ground prep, forms and over-dig change the real number.

THE MATH

How it works.

  1. Slab: length × width × (thickness in inches ÷ 12) = cubic feet.
  2. Footing: length × (width ÷ 12) × (depth ÷ 12) = cubic feet.
  3. Column: 3.1416 × radius² × height × how many, with the radius in feet.
  4. Cubic yards = cubic feet ÷ 27. Add your waste percent to get the amount to order.
  5. Bags = cubic feet with waste ÷ the bag's yield, rounded up.

NEXT STEP

Turn the rough number into a real estimate.

The free Peak estimate tool lays out options, takes the signature and collects the deposit.

See the free estimate tool →

QUESTIONS

Common questions.

Multiply length × width × thickness, all in feet, then divide by 27. A 10 × 10 ft slab at 4 inches is about 1.23 cubic yards before waste.

Many crews add 5 to 10 percent for uneven ground and spillage. Ask your supplier what they recommend for the job.

At a typical yield of 0.60 cubic feet per 80 lb bag, about 45 bags make a cubic yard. Check the bag, since yields vary by mix.

Try the Peak tools.

Leads, estimates, invoices, jobs and photos, with Sherpa doing the office work.

Sign-up opens soon. The demo is open now, with made-up data, no sign-up needed.